Part II Post-flight
Josephine
Mission
SUA
SUA Maintenance
Battery
Client
Staffs
Staffs
Roles
Home
Mission
Tai Ho, New Lantao - Build King - Aerial Photos
Locations
MTR Siu Ho Wan Depot 1
Dates
2023-08-30
Part II Post-flight
Back
Save
Created: 2023-08-30 16:33:09 (ysd-vincent)
Updated: 2023-08-30 16:33:09 (ysd-vincent)
Status
Relevant logs and records are completed
Yes
Radio
No
Radio
Rotor blade(s) are checked with no cracks or damage
Yes
Radio
No
Radio
Visual check on the aircraft is normal with no damage
Yes
Radio
No
Radio
Temperature of motor and remote control device are normal
Yes
Radio
No
Radio
Temperature of battery is normal with no swelling
Yes
Radio
No
Radio
Mobile application and the aircraft’s firmware have been updated to the latest versions
Yes
Radio
No
Radio
Aircraft and remote control device are off
Yes
Radio
No
Radio
Motor is shut down normally
Yes
Radio
No
Radio
Conducted By Name (From DB)
Select Staff
Conducted By Name (Manual)
Signature
Click here to sign
Checkbox
Conducted By Position (From DB)
Select Role
Conducted By Position (Manual)
Conducted By Date
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.