Site Survey
Josephine
Mission
SUA
SUA Maintenance
Battery
Client
Staffs
Staffs
Roles
Self-Assessment
Answer Template
Risk Assessment
Home
Mission
Tai Ho, New Lantao - Build King - Aerial Photos
Locations
MTR Siu Ho Wan Depot 1
Site Survey
Back
Save
Created: 2023-08-30 16:33:09 (ysd-vincent)
Updated: 2023-08-30 16:33:09 (ysd-vincent)
Site Information
Lat
Lng
Task Description
What time is it (Date)?
What time is it (Time)?
:
Which SUA are you using?
SUA A | A12345678 | 1234
SUA C | 99999999 | 999999991
Assessment
Weather conditions for the planned event (e.g. ground visibility, cloud base, wind speed, precipitation, etc.)
Permission from the land owner / property manager concerned (if required)
Altitudes and routes to be used on the approach to and departure from the area of operations
Security measures required to limit public access to the area of operations (if required)
Habitation and recreational activities nearby
Hazards / possible radio interference associated with industrial sites or activities such as live firing, fuel tank, high tension cables, high-intensity radio transmission, etc.
Flight restrictions related to the area of operations (e.g. Restricted Flying Zones established, local by-laws at country parks, etc.)
Proximity to other aircraft operations
Location and height of obstructions (e.g. buildings, trees, etc.)
Boundary of the area of operations (including likely take-off / landing area and alternative site)
Conducted By Name (From DB)
Select Staff
Conducted By Name (Manual)
Signature
Click here to sign
Checkbox
Conducted By Position (From DB)
Select Role
Conducted By Position (Manual)
Conducted By Date
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.